Port operation
Port operation is the traditional business line of Vinh Tan Port. Facilities, infrastructure and treatment facilities are always invested and upgraded to serve the growing demand for goods in the market.
– Main port operations services
services
Port conditions | Main equipment | Logistics area |
– Length of berth: 145m – Depth in front of wharf: -12m – Depth of the ship turning area: -12m – Radius of the ship turning area: 360m – Width of berth: 33.5m – Area in front of wharf: 11.6ha – Area behind wharf: 20ha – Anchor floats 60 tons, 200 tons: 4 – Pile of bits: 7 pieces – Cushion and: 14 pieces |
– Multi-purpose cranes 40 tons: 02 units Reach Stacker / Forklift: 04 units – Forklift trucks 2.5 tons / 5.0 tons / 10.0 tons: 05 units – Specialized trucks for transporting containers + trailers: 20 units Modern technology conveyor system: 01 system (10,000 MT / day). – Weight station 80 tons: 01 – Funnel: 2 pieces |
– Department store: 8.404m2 – Container yard CY: 15.446m2 – Reefer yard: 3,034m2 – Empty container yard: 5.099m2 – Multi-purpose cargo area: 4,410m2 – Technical and logistics service area: 3,700m2 |